Home / Projects / Steel Structure Terminal-3

Steel Structure Terminal-3

Steel structure works for the Terminal 3 expansion at Hazrat Shahjalal International Airport — Bangladesh's largest aviation project.

Steel Structure Terminal-3

Terminal 3 more than doubles the capacity of Bangladesh's principal international gateway. BOF Korea delivered the steel structure package: fabrication coordination, erection sequencing and on-site quality control across a long-span roof and concourse frame.

Delivery

Work was carried out alongside Samsung C&T under the Civil Aviation Authority of Bangladesh, to Korean and international steel codes, with full material traceability and weld inspection on every critical connection.