
Terminal 3 more than doubles the capacity of Bangladesh's principal international gateway. BOF Korea delivered the steel structure package: fabrication coordination, erection sequencing and on-site quality control across a long-span roof and concourse frame.
Work was carried out alongside Samsung C&T under the Civil Aviation Authority of Bangladesh, to Korean and international steel codes, with full material traceability and weld inspection on every critical connection.